Software Requirements for a Final-Year Project

Project planning artwork connecting documented requirements, design and evaluation

To write software requirements for a final-year project, record where each need came from, express the intended behaviour or constraint clearly, and state how it will be checked. Keep proposed requirements distinguishable from confirmed ones. A feature list alone does not explain why the software needs those features.

Your report should connect the problem you investigated to the system you designed and the evidence you gathered. UniDraft helps organise your confirmed requirements, design material and actual evaluation findings into an editable project document. Start your software project write-up, then check the document against your records. You obtain the evidence and build and test the system; UniDraft does not perform those tasks.

What belongs in the requirements section?

Describe the intended users, system boundary, capabilities and relevant constraints. Your supervisor's brief determines whether these belong in a standalone software requirements specification, a methodology section or another arrangement. There is no single heading list that every Nigerian software project must use.

The IEEE Computer Society's requirements overview distinguishes functional capabilities from nonfunctional constraints and explains clear, verifiable, traceable requirements. Its industry examples are background, not performance targets or compulsory student headings.

Keep three records separate:

Record Question it answers
Requirement What should the system do, or what condition should it meet?
Design decision How do you propose to satisfy it?
Evaluation evidence What actually happened when the implementation was checked?

For example, needing to prevent overlapping bookings is different from choosing a database or proving that concurrent requests were handled correctly.

Build a source ledger before writing “users need”

Use only evidence you actually obtained with appropriate permission. Possible inputs include an authorised observation, a genuine consultation, a permitted document or an explicit project brief. A convenient assumption is not a reported interview finding.

Use this original working ledger:

Field What to record
Source ID and date A stable reference to the actual evidence
Source type Consultation, observation, document, brief or your own proposal
Relevant evidence The actual need or issue, keeping quotation and interpretation separate
Permission and confidentiality What you may retain, quote or show
Interpretation What you think the evidence means for this system
Confirmation status Confirmed, proposed or unresolved, with a real decision reference where available

Protect personal information. A public report may use a suitable evidence code while the permitted supporting record stays securely stored. If access to intended users was unavailable, state that limitation; do not manufacture stakeholder validation. The ethics and consent guide helps plan appropriate evidence collection.

Turn a vague wish into separate requirements

Original fictional teaching exercise: a proposed campus equipment-booking system. No student interview, deployed service, institutional rule or successful test is claimed.

The starting sentence is “The system should be fast, secure and user friendly.” It leaves the actor, behaviour, conditions and evidence unclear. Break it into questions before choosing the final wording:

Concern Proposed wording or question Still to confirm
Booking behaviour A permitted student can request an available item for a specified period Eligibility, availability rules and required request fields
Conflict handling A request overlapping an existing booking for the same item is rejected Whether touching time boundaries count as overlap; simultaneous requests
Access boundary A student can view their own requests; other access follows explicitly defined roles Real roles, exceptions and permitted data
Response time Define the action, measurement point, test conditions and acceptable criterion An agreed target and feasible measurement procedure
Usability Define the relevant user task and evaluation criterion Participants, permissions, procedure and interpretation limits

These are proposed records, not stakeholder-approved requirements. Do not copy an arbitrary two-second target or call the system secure because it has a login screen. Resolve the context and verification method with appropriate advice.

Keep one requirement per reviewable record

Assign stable IDs so a changed sentence does not break every reference. Adapt this original worksheet to your brief:

Field Example entry type, not a completed requirement
Requirement ID and version REQ-01, revision identifier
Source and need Actual source ID; why this behaviour matters
Statement Actor, action, conditions and observable outcome
Scope or exception Where it applies and what remains outside it
Priority and rationale Why it belongs in this deliverable rather than future work
Confirmation Real decision, date and unresolved question; no invented approval
Planned verification Relevant review, demonstration, test or evaluation reference
Dependent material Design model, implementation reference and later evidence

Read each statement aloud to someone familiar with the task. Ask what would count as meeting it and what would count as a failure. If the answers depend on unstated rules, the requirement still needs work.

Connect requirements to diagrams and tests

Follow one chain: source → requirement → design → implementation → check → evidence. A missing link is a question to resolve, not a blank to fill with a plausible claim.

Use the system-design diagram guide to choose the view that explains the relevant rule. A use-case diagram does not by itself specify every access or concurrency condition. Use the software test-case worksheet to define checks and record versioned executions. An expected result belongs to the plan; it becomes an observed result only after a real run.

For a quality requirement, choose evidence suited to the claim. A timed demonstration on one device cannot establish performance for every user. A usability evaluation answers defined user-task questions; it is not a complete security assessment. State what was not evaluated.

Record changes without rewriting project history

If a proposed requirement changes, keep its earlier version and record the reason. Identify affected diagrams, code and checks before claiming the updated documentation is consistent.

Change record What to retain
Request and reason What changed and the actual supporting information
Affected IDs Requirements, models and planned or completed checks
Decision and status What was genuinely agreed, deferred or remains unresolved
New version Where the revised requirement is recorded
Consequences What must be updated or rechecked; remaining limitations

Moving a feature to future work should be visible in the objectives, scope and evaluation account where relevant. Do not describe it as implemented merely because it appears in an older diagram.

Before submission or defence

  • Every claimed stakeholder need has a traceable, permitted source, or is labelled as a proposal.
  • Functional behaviours and quality constraints have clear conditions and planned verification.
  • Priorities fit the actual objectives and available resources.
  • Confirmation, implementation and successful evaluation are not conflated.
  • Changes are reflected consistently in the requirement record, diagrams and evidence.
  • You can explain one requirement's origin, design consequence, check and limitation.

When those records are ready, UniDraft can help turn the work you confirm into a written project for review. Start your project document and compare every requirement and evaluation claim with the underlying evidence before submission.

Source and scope

IEEE Computer Society: Software Requirements Specifications, read 25 October 2026, supports the requirements concepts used here. The ledgers and booking exercise are original teaching aids, not copied institutional templates or evidence of a completed project. Follow your supervisor's confirmed instructions for the actual report arrangement.

Frequently asked questions

What is a software requirements specification?

It records what the proposed software must do and the conditions or constraints it must meet. For a student project, explain each requirement's source, scope, confirmation status and planned verification, using the arrangement required by your brief.

What is the difference between functional and nonfunctional requirements?

Functional requirements describe behaviours or capabilities. Nonfunctional requirements describe quality conditions or constraints. Both need clear wording and an appropriate way to check them; a vague claim such as fast or secure is insufficient.

Can I invent stakeholder interviews for my requirements?

No. Record only consultations, documents and observations you actually used and were permitted to use. Label your own assumptions or proposed requirements honestly and identify what still needs confirmation.

Does an agreed requirement mean the software passed its tests?

No. Agreement records the intended requirement. Implementation and testing require their own actual evidence, tied to the relevant software version and conditions.